TECHNICAL REPORT ON THE HYDRAULIC CAPACITY ANALYSIS OF THE EXISTING STRUCTURE
TECHNICAL REPORT ON HYDRAULIC CAPACITY ANALYSIS OF THE EXISTING STRUCTURE IN TV-7041 PK 21+520
Analysis of the hydraulic capacity of the structure, calculation of the return period for the maximum avenue supported. Proposal for modification of actions, simulation of elimination of central pile and protection of stirrups.